The management of FK Crvena Zvezda, a former winner of the UEFA Champions League, expressed their desire to replace the old lamp scoreboard at their stadium with a new modern LED display screen. The contract for the job was awarded to the company VOX-002, who enlisted our services (Poled) to carry out the project. Within a period of 12 days, we delivered all the necessary equipment (a 15.36 x 5.76 m LED display screen, a Media Server with two sending cards for signal transmission) and within 36 hours, we removed the old scoreboard and its structure, built a new metal framework, installed, and calibrated the equipment. At the time of installation, the scoreboard was one of the largest in Europe.